Case Note & Summary
The appeal was filed by Fortune Global Solution Pte. Ltd. against an order of the NCLT dismissing its application to set aside an e-auction and Sale Certificate related to the liquidation of Lanco Kondapalli Power Limited. The corporate debtor was admitted into Corporate Insolvency Resolution Process (CIRP) on 23.04.2019, which later failed, leading to its liquidation on 16.04.2021. The Liquidator conducted multiple rounds of e-auction, with the second round on 16.06.2022 resulting in MCM Pacific Pte. Limited being declared the successful bidder. The Appellant contended that the Sale Certificate issued on 26.03.2026 deviated from the original auction terms and raised concerns about the Liquidator's neutrality and the auction process's integrity. The NCLT framed issues regarding the Appellant's standing, the timeliness of the challenge, and the validity of the Sale Certificate. The NCLT concluded that the Appellant, as a non-participant, lacked locus standi to challenge the auction and that the challenge was barred by limitation. The court found that the Sale Certificate's terms were consistent with the process document and did not constitute a material deviation. The appeal was dismissed, and a cost of Rs.10 lakhs was imposed on the Appellant for burdening the liquidation process. The NCLAT upheld the NCLT's decision, reducing the cost to Rs.1 lakh, emphasizing the need to deter frivolous litigation in insolvency matters.
Headnote
A) Insolvency and Bankruptcy - Locus Standi - Challenge to E-Auction - Section 60(5) of the IBC, 2016 - The Appellant, being a non-participant in the e-auction, lacked the standing to challenge the auction results and Sale Certificate. The NCLT held that without demonstrating sufficient interest or participation, the Appellant could not seek to annul the concluded sale (Paras 5-11). B) Limitation - Timeliness of Challenge - Section 60(5) of the IBC, 2016 - The challenge to the e-auction was barred by limitation as it was not raised until after the auction had attained finality. The NCLT concluded that the delay in filing the application undermined the Appellant's claims (Paras 5-11). C) Sale Certificate Validity - Compliance with Process Document - Liquidation Process Regulations, 2016 - The NCLT found that the Sale Certificate's terms did not constitute a fundamental deviation from the auction process, as the extended dismantling period was permissible under the process document. The court upheld the Liquidator's actions as compliant with the regulations (Paras 6-11).
Issue of Consideration
Whether the Appellant has the locus standi to challenge the e-auction and Sale Certificate under Section 60(5) of the IBC, 2016.
Final Decision
The NCLAT dismissed the appeal, affirming the NCLT's order and upholding the imposed cost of Rs.10 lakhs.
Law Points
- IBC
- 2016
- Section 60(5)
- Liquidation Process Regulations
- e-auction validity
- Sale Certificate legality
- locus standi
- limitation principles



